ANALYSIS OF TIME COST TRADE-OFF APPROACH ON CRITICAL PATH METHOD TO ACCELERATE CONSTRUCTION PROJECT COMPLETION
DOI:
https://doi.org/10.31258/jomso.v2i2.38Keywords:
Project scheduling, critical path method, time cost trade off, addition of overtime hoursAbstract
The article discusses the analysis of project scheduling using the critical path method (CPM) to identify the project's critical path, allowing for the determination of the overall project completion time. This is further analyzed using the time cost trade off (TCTO) approach to evaluate the duration and costs after adding two hours of overtime on the critical path, with the assistance of Microsoft Excel software. The objective of this problem is to optimize project completion time and minimize delays based on the duration and costs of project activities. The calculation results indicate the optimal time and cost for project completion, and suggest that project acceleration can be achieved by selecting activities that can be expedited through the addition of overtime hours.
References
Doraisamy, S. V., Akasah, Z. A., and Yunus, R., 2015, An overview on the issue of delay in the construction industry, Springer Science+Business, Volume : 1 pp 313–319.
Hasyyati, S. N., Puspita, I. A., and Tripiawan, W., 2020, Project acceleration of outside plant-fiber optic (OSP-FO) project in PT. XYZ using time cost trade off (TCTO) method by adding overtime hours, IOP Conference Series: Material Science and Engineering, Volume : 852 pp 1–6
Heizer, J., and Render, B., 2011, Operations Management, Tenth Edition, Prentice Hall, Upper Saddle River.
Keane, P. J., and Caletka, A. F., 2008, Delay Analysis in Construction Contracts, Blackwell Publishing, Chichester.
Kerzner, H., 2009, Project Management: A Systems Approach to Planning, Scheduling, and Controlling, Tenth Edition, John Wiley and Sons Incorporated, Hoboken.
Lawrence, J. A., and Pasternack, B. A., 2002, Applied Management Science: Modeling, Spreadsheet Analysis, and Communication for Decision Making, Second Edition, John Wiley and Sons Incorporated, New York.
Lester, A., 2006, Project Management Planning and Control: Managing Engineering, Construction and Manufacturing Projects to PMI, APM and BSI Standards, Fifth Edition, Elsevier Science and Technology Books, Oxford.
Mahardika, A. G., Fadriani, H., Muntiyono, Afiyah, S., and Ramady, G. D., 2019, Analysis of time acceleration costs in level building using critical path method, Journal of Physics: Conference Series, Volume : 1424 pp 1–6.
Murthy, P. R., 2007, Operations Research, Second Edition, New Age International (P), New Delhi.
Winston, W. L., 2004, Operations Research: Applications and Algorithms, Fourth Edition, Thomson Learning, Belmont.