PROJECT SCHEDULING ANALYSIS USING THE CPM AND PERT : A CASE STUDY

Authors

  • Mella Aprilya Suharni Department of Mathematics, University of Riau, Indonesia
  • Endang Lily Department of Mathematics, University of Riau, Indonesia

DOI:

https://doi.org/10.31258/jomso.1.1.25-36

Keywords:

project scheduling, critical path method, program evaluation and review tehcnique

Abstract

This article discusses the scheduling analysis of a project using the critical path method (CPM) and the program evaluation and review technique (PERT) to find the project's critical path so that the overall project time can be determined. This problem aims to optimize the completion time of a project and minimize delays that cause project planning to be inconsistent with what is in the field based on activity time, activity implementation schedule, and project activity costs. This problem analysis is carried out with the help of Excel Solver software. The calculation results show that the optimal project completion time is obtained and the acceleration of project completion can be accelerated by selecting activities that can be accelerated with the project acceleration costs

References

Chen, B., and Hall, N. G., 2021, Incentive Schemes for Resolving Parkinson’s Law in Project Management. European Journal of Operational Research, Volume: 288 pp 666-681.

Dantzig, G. B., and Thapa, M. N., 1997., Linear Programming 1: Introduction, Springer, New York.

Gaither, N., and Frazier, G., 2002., Operations Management, Thomson Learning, Cincinnati.

Heizer, J., and Render, B., 2011., Operations Management, Pearson Education Incorporated, Upper Saddle River.

Karabulut, M., 2017, Application of Monte Carlo Simulation and PERT/CPM Techniques in Planning of Construction Projects: A Case Study. Periodicals of Engineering and Natural Sciences, Volume: 5 pp 408-420.

Kerzner, H., 2009., Project Management: A Systems Approach to Planning, Schedulling, and Controlling, John Wiley & Sons Incorporated, Hoboken.

Lawrence, J. A., and Pasternack, B. A., 2002., Applied Management Science: Modeling, Spreadsheet Analysis, and Communication for Decision Making, John Wiley & Sons Incorporated, Fullerton.

Liu, M., 2013, Program Evaluation and Review Technique (PERT) in Construction Risk Analysis. Applied Mechanics and Materials, Volume: 357-360 pp 2334-2337.

Turner, J. R., 2008., The Handbook of Project-Based Management, McGraw-Hill Companies Incorporated, London.

Winston, W. L., 2004., Operations Research: Applications and Algorithms, Fourth Edition, Thomson Learning, Belmont.

Zareei, S., 2018, Project Scheduling for Constructing Biogas Plant Using Critical Path Method. Renewable and Sustainable Energy Reviews, Volume: 81 pp 756-759.